How long should it take to install hardwood floors in a 2,000 sf space? (two floors of a home and stairs) | Two days | 7% | Three days | 15% | Four days | 15% | Five days | 7% | Six days | 7% | At least one week | 38% | Not sure | 7% | | | Question: How long should it take to install hardwood floors in a 2,000 sf space? (two floors of a home and stairs) Top Answer (38% of 13 votes): At least one week.
Answer: Five days Explanation: When installing any floor it all depends on demo or no demo | Tc's Hardsurfaces& more LLC | Answer: At least one week Explanation: Installing hardwood floors in a 2,000 square feet space, covering two floors of a home and stairs, is a substantial project. This installation typically takes at least one week. The duration can vary based on the complexity of the project, the specific details of the space (like the layout of the rooms and the stairs), the type of hardwood flooring, and the proficiency of the installation team. Additional time may be required for preparation, such as removing old flooring or preparing subfloors, and for finishing touches after the main installation. | DS Contracting | Answer: At least one week Explanation: For a 3 men crew. | SERVICE MAX INTERNATIONAL, INC | | ProMatcher | Answer: At least one week Explanation: Floor pre and cureing time | Floors 2 UR Doors |
|